[ad_1]
Day 1: first and second floor ceilings complete (with the exception of the cathedral ceilings in living room) and first floor walls in progress.
[ad_2]
Source
[ad_1]
Day 1: first and second floor ceilings complete (with the exception of the cathedral ceilings in living room) and first floor walls in progress.
[ad_2]
Source